WATTSHIP

Acquisition · Discipline

Pro-Buyer Protocol

A used import goes wrong in a small number of well-understood ways, and nearly all of them are cheap to catch before the hammer and expensive afterwards. The ordering is the whole point: verifying a chassis number after the deposit has been wired is not verification, it is accounting.

0/15

12 irreversible checks still open — these are the ones that cannot be undone later.

BEFORE YOU BID

BEFORE YOU PAY

BEFORE IT SHIPS

BEFORE IT LANDS

Document requirements are read from the same table the deal room enforces, so this list and the phase gates cannot tell you two different things. This tool does not price anything and does not estimate duty — those are separate tools with their own sourcing. It answers one question: have you checked the things that cannot be undone?

FLUX · Chief Engineermi · USD